{"process_model":{"id":"mca-2026-10","as_of":"2026-10-09","pathway":"Major Capability Acquisition"},"stages":[{"id":"NORMALIZE","title":"Document normalization","kind":"agents","owner":"intake","parallel":false,"sources":[]},{"id":"SCREEN","title":"Document screening","kind":"agents","owner":"requirement","parallel":false,"sources":[]},{"id":"REQUIREMENT","title":"Service capability requirement","kind":"agents","owner":"requirement","parallel":false,"sources":["S3 Encl. A 6.b","S3 Encl. E 1.b"]},{"id":"SERVICE-VALIDATION","title":"Service Requirements Validation","kind":"gate","owner":"requirement","parallel":false,"sources":["S1 p.1","S2 para 1.b"]},{"id":"JCI-REVIEW","title":"Joint Capability Integration review","kind":"gate","owner":"requirement","parallel":true,"sources":["S3 Encl. A 6.c-d","S3 Encl. B 2.b"]},{"id":"MDD-PACKAGE","title":"Materiel Development Decision package","kind":"agents","owner":"msa","parallel":false,"sources":["S5 3.5","S5 2.3.b"]},{"id":"MDD","title":"Materiel Development Decision","kind":"gate","owner":"msa","parallel":false,"sources":["S5 3.5"]},{"id":"MSA","title":"Materiel Solution Analysis","kind":"agents","owner":"msa","parallel":false,"sources":["S5 3.6","S5 3.7.a(1)","S6 3.1","S4 4.1"]},{"id":"MILESTONE-A-PACKAGE","title":"Milestone A package","kind":"agents","owner":"msa","parallel":false,"sources":["S5 3.7.a-b"]},{"id":"MILESTONE-A","title":"Milestone A","kind":"gate","owner":"msa","parallel":false,"sources":["S5 3.7.c"]},{"id":"TMRR-SRR","title":"TMRR: System Requirements Review package","kind":"agents","owner":"tmrr","parallel":false,"sources":["S6 3.2","S5 3.8"]},{"id":"SE-REVIEW-SRR","title":"System Requirements Review","kind":"gate","owner":"tmrr","parallel":false,"sources":["S6 3.2"]}],"orchestrators":["requirement","msa","tmrr","traceability"],"gates":{"SERVICE-VALIDATION":{"name":"Service Requirements Validation","authority":"Service requirements board","blocking":true,"non_delegable":true,"sources":["S2 para 1.b","S3 Encl. A 6.b","S3 Encl. E 2"]},"JCI-REVIEW":{"name":"Joint Capability Integration review","authority":"JROC, JCB or FCB by Joint Staffing Designator (Service Information: awareness only)","blocking":false,"non_delegable":true,"sources":["S3 Encl. A 6.c-d","S3 Encl. B 2.b"]},"MDD":{"name":"Materiel Development Decision","authority":"Milestone Decision Authority (Service Chief concurrence for MDAPs)","blocking":true,"non_delegable":true,"sources":["S5 3.5","S5 2.3.b"]},"MILESTONE-A":{"name":"Milestone A","authority":"Milestone Decision Authority (Service Chief concurrence for MDAPs)","blocking":true,"non_delegable":true,"sources":["S5 3.6-3.7","S4 4.1","S6 3.1"]},"SE-REVIEW-SRR":{"name":"System Requirements Review","authority":"Technical review chair appointed by the Service; criteria tailored by the Chief Engineer","blocking":true,"non_delegable":true,"sources":["S6 3.2"]}},"designed_not_built":["SFR","PDR","CDD-VALIDATION","DEV-RFP-RELEASE","MILESTONE-B","OTHER-PATHWAYS","RRAB-JAR","JCI-TRIPWIRES","SPECIAL-PATHS"],"topics":{"requirement":"next.das.requirement","mdd_package":"next.das.mdd","msa":"next.das.msa","tmrr":"next.das.tmrr","traceability":"next.das.traceability","drift":"next.das.drift","results":"next.das.results"}}